Reports
Listed below are links to the available
Upper Mississippi River Comprehensive Plan Reports. Adobe
Acrobat Reader 4 or above is required to view the reports. Get
Adobe Acrobat Reader
Some of the files are quite large
in size, and depending on your network connection speed, may require a
long time to download for viewing and printing. If you would like the
reports mailed to you on CD, please contact:
Rock Island District
Librarian - Mr. Bob Romic ( email
)
U.S. Army Corps of Engineers
P.O. Box 2004
CEMVR-IM-CL
Rock Island, IL 61204-2004
(309) 794-5576
Disclaimer of Copyright Status:
"The United
States Government retains a non-exclusive, royalty-free license to publish
or reproduce these documents, or allow others to do so, for United States
Government purposes. These documents may be freely distributed and used
for non-commercial, scientific and educational purposes. Commercial use
of these documents may be protected under the United States and Foreign
Copyright Laws. Individual documents on this server may have different
copyright conditions, and will be noted in those documents."
| Report
and Description |
Existing
Economic Conditions Report - May 2004 (8.44
MB) |
| |
Description |
This
report, prepared by the Tennessee
Valley Authority, documents the existing economic conditions
within the study area to provide a context for evaluating the regional
economic impacts of alternatives being considered as part of the Upper
Mississippi River Comprehensive Plan. The report describes the
current demographics, economy, and transportation infrastructure of
the study area. |
| |
|
|
| An
Economic Evaluation of Proposed Flood Protection Plans on the Upper
Mississippi River and Illinois Waterway - October 2004
(0.7 MB) |
| |
Description |
This
report, prepared by the Tennessee
Valley Authority, estimates the regional economic impacts
of three structural alternatives for flood damage reduction on the Upper
Mississippi River and Illinois Waterway. |
| |
|
|
| Upper
Mississippi River Comprehensive Plan - Final Report June 2008 (Revised Aug 14, 2008) |
| |
Description |
Each
of the links below will take you to the the individual sections of
the Final Report Most readers will want to start with
the Final Report. Unless specified, most of the downloaded files are less than 2 MB.
Upper
Mississippi River Comprehensive Plan - Final Report (1.6 MB)
Mapping
Products:
Plan
Maps - Maps depicting:
Alternative
B
Alternative
C
Alternative
D
Alternative
E
Alternative
G
Alternative
M
UMR
Comprehensive Plan Study Extent
Reach
Maps showing existing flood damage
reduction projects:
Reach
1 - St. Paul, MN, to Lock & Dam 13 (18 MB)
Reach
2 - Lock & Dam 13 to Keokuk, IA (14 MB)
Reach
3 - Keokuk, IA, to Thebes, IL (18 MB)
Reach
4 - Illinois Waterway (15 MB)
Tabular
summary of existing flood damage reduction projects
Report
Appendices:
Appendix
A - Environmental Planning and Analysis
Supplemental
Chapters:
Appendix
B - Hydrology and Hydraulics
Appendix
C - Economic Analysis
Appendix
D - Cost Estimates
Appendix
E - Cultural Resources
Appendix
F - Public Involvement
Appendix
G - Real Estate
Appendix
H - Recreational Considerations
Appendix
I - Risk Informed Decision Framework (RIDF)
|